background image

SWING FRAMES

DATE:  08/29/2014

INSTALLATION GUIDELINES

Page 14 of 20

SINGLE 5” POST SWING FRAME

STEP 1 

Refer to PLAN VIEW and FOOTING LAYOUT to locate swing frame.

Detail A

STEP 2

Excavate footing as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer block in the 

bottom of each hole.

STEP 3

Select two vertical posts with caps (5”x144”), two 5”x5” receivers, two 5” saddles, eight 3/8”x1-3/4” security 

TORX bolts and eight 3/8”x1/2” rectangular weld nuts. With posts laying on ground, attach one receiver 

and one saddle to top of each post (even with edge of cap) using four bolts and four nuts (see Detail A). 

NOTE:

  Bolts will be inserted through saddle (weld nuts through receiver). Make sure both sides of saddle/

receiver are evenly spaced. No more than 2 threads may be showing. Tighten hardware.

Vertical Post

3/8” Rectangular Weld Nut

3/8”x1-3/4” 

Security TORX Bolt

1/4”x1” Drive Pin

(installed step 7)

5”  Saddle  

5” Receiver

Set Screw 

1/2”x3/4”

(installed step 5)

STEP 4

If swing frame is a multi-bay, select post(s) with cap (5”x144”), 5”x5” receivers (two per post), 3/8”x2” 

security TORX bolts and 3/8”x1/2” rectangular weld nuts (four of each per middle post). Attach receivers 

to top of post (even with edge of cap) using bolts and nuts (see Detail B). Make sure both sides of saddle/

receiver are evenly spaced. No more than 2 threads may be showing. Tighten hardware. These will be 

the middle swing posts.

Detail B

Vertical Post

3/8”x2” Security 

TORX Bolt

3/8” Rectangular Weld Nut

1/4”x1” Drive Pin

(Installed in step 6)  

5” Receiver

1/4”x1” Drive Pin

(Installed in step 6)  

5” Receiver

Summary of Contents for Arch

Page 1: ...plied to you If you did not receive a copy or if you have a question regarding anything covered in this manual contact your local sales representative USER GROUP 2 12 RECOMMENDED CREW At least 2 peopl...

Page 2: ...ame Full bucket seats require a 2 5 label all other seats require a 5 12 label For safety reasons do not attach swing chains or seats to swing frame until playground is ready to open NOTE Swing seats...

Page 3: ...sembly Center SH 51 on swing top bar NOTE Center of SH 51 will be 92 5 8 from center of vertical post Attach SH 51 to top bar of swing frame by inserting bolts down through swivel halves Secure bottom...

Page 4: ...ES DATE 08 29 2014 INSTALLATION GUIDELINES Page 4 of 20 FOOTING LAYOUT 3 5 ARCH FRAME ONE BAY FOOTING LAYOUT 3 5 ARCH FRAME TWO BAY FOOTING LAYOUT 3 5 ARCH FRAME THREE BAY FOOTING LAYOUT 3 5 ARCH FRAM...

Page 5: ...DATE 08 29 2014 INSTALLATION GUIDELINES Page 5 of 20 FOOTING LAYOUT 5 ARCH FRAME ONE BAY FOOTING LAYOUT 5 ARCH FRAME TWO BAY FOOTING LAYOUT 5 ARCH FRAME THREE BAY FOOTING LAYOUT 5 ARCH FRAME FOUR BAY...

Page 6: ...FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 6 of 20 FOOTING LAYOUT 5 TIRE FRAME ONE BAY FOOTING LAYOUT 5 TIRE FRAME TWO BAY FOOTING LAYOUT 5 TIRE FRAME THREE BAY FOOTING LAYOUT 5 TIRE FRAME FO...

Page 7: ...frame The 2 3 8 x168 swing legs are used for the 10 tri pod swing The swing legs with bend are used for the ends of the tripod 2 3 8 x136 with bend for the 8 tri pod and 2 3 8 x168 with bend for the 1...

Page 8: ...e a 2 5 label all other seats require a 5 12 label For safety reasons do not attach swing chains or seats to swing frame until playground is ready to open NOTE Swing seats and chains sold separately B...

Page 9: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 9 of 20 BI POD FOOTING ONE BAY BI POD FOOTING TWO BAY BI POD FOOTING THREE BAY BI POD FOOTING FOUR BAY...

Page 10: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 10 of 20 8 TRI POD FOOTING ELEVATION END 8 TRI POD FOOTING ELEVATION SIDE 8 TRI POD FOOTING ONE BAY 8 TRI POD...

Page 11: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 11 of 20 8 TRI POD FOOTING TWO BAY 8 TRI POD FOOTING THREE BAY 8 TRI POD FOOTING FOUR BAY...

Page 12: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 12 of 20 10 TRI POD FOOTING ELEVATION END 10 TRI POD FOOTING ELEVATION SIDE 10 TRI POD FOOTING ONE BAY 10 TRI POD...

Page 13: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 13 of 20 10 TRI POD FOOTING TWO BAY 10 TRI POD FOOTING THREE BAY 10 TRI POD FOOTING FOUR BAY...

Page 14: ...r Make sure both sides of saddle receiver are evenly spaced No more than 2 threads may be showing Tighten hardware Vertical Post 3 8 Rectangular Weld Nut 3 8 x1 3 4 Security TORX Bolt 1 4 x1 Drive Pin...

Page 15: ...hanger tabs at 6 00 Install and tighten set screws see Detail C Top Rail Top Rail 1 2 x3 4 Set Screw 1 4 x1 Drive Pin top of one receiver bottom of other 1 4 x1 Drive Pin top of one receiver bottom o...

Page 16: ...SWING FRAMES DATE 08 29 2014 INSTALLATION GUIDELINES Page 16 of 20 FOOTING ELEVATION SINGLE 5 POST SWING FRAME...

Page 17: ...LATION GUIDELINES Page 17 of 20 SINGLE 5 POST FRAME ONE BAY SINGLE 5 POST FRAME TWO BAY SINGLE 5 POST FRAME THREE BAY SINGLE 5 POST FRAME FOUR BAY 138 18 X36 DEEP 138 18 X36 DEEP 138 138 18 X36 DEEP 1...

Page 18: ...Post 3 8 x2 Security TORX Bolt 3 8 Rectangular Weld Nut 1 4 x1 Drive Pin Installed in Step 6 New 5 Receiver 1 4 x1 Drive Pin Installed in Step 6 Existing 5 Receiver Detail A STEP 4 Select vertical po...

Page 19: ...rive Pin STEP 6 Select five 1 4 x1 drive pins Drill one 1 4 hole in each post through back of saddle and two 1 4 diagonal holes through opposite sides of each receiver in the flat area by attachment h...

Page 20: ...swings at rest shall be no less than 24 when measured at 60 above the protective surfacing The horizontal distance between the supporting structure and the adjacent to fro swing seat shall be no less...

Reviews: