93
Operation
(2/2)
6.
Choose the
On-Time
in seconds.
The on-time setting determines how long the load is
turned on for the selected step.
The on-time is defined as the total test time minus the
off-time.
On-Time:
0.1 ~ 60 seconds
7.
Choose the
Off-Time
in seconds.
The off-time setting determines how long the load is
turned off between the end of the current step and the
start of the next step.
The off-time is defined as the total test time minus the
on-time.
Off-Time:
Off, 0.1 ~ 60 seconds
8.
Choose the
P/F-Time
(pass/fail time) in seconds.
The P/F-Time refers to the P/F delay time. This delay
time includes the 0.06 P/F start test time, as shown in
the timing diagram on page 91.
P/F-Time:
Off, 0.0 ~ 119.9 seconds
9.
Set the
Short-Time
in seconds.
Has the same action as pressing the short key. See
page 45 (
2-1-10. Short Key Configuration
) for details
about shorting the load.
Short-Time:
Off, 0.1 seconds ~ On-Time
10. Repeat steps 3 to 9 for all the steps in the program.
A maximum of 16 steps per program can be created.
Steps that are not configured are set to “Skip” by
default.
11.
Save
[F3] to save the program and all the steps in the
program.
The program will be saved to internal memory.
See the Save/Recall chapter on details on how to
save to Setup memory.
Recall Default
Pressing
Recall Default
[F4] will recall the default settings
for each program/step. See page 163 (
7-3. LSG-H Series
Default Settings
) for details.
Summary of Contents for LSG-1050H
Page 24: ...14 GRA 414 E EIA standard 132 382 5 477 6 GRA 414 J JIS standard 149 382 5 477 6...
Page 185: ...175 7 6 Operating Area 7 6 1 LSG 175H H Range M Range L Range...
Page 186: ...176 7 6 2 LSG 350H H Range M Range L Range...
Page 187: ...177 7 6 3 LSG 1050H H Range M Range L Range...
Page 188: ...178 7 6 4 LSG 2100H H Range M Range L Range...
Page 204: ......