74
2-7-2. Running a Go-NoGo Test
Description
Go-NoGo test results are displayed in the measurement
panel of LCD display.
GO indicates pass (good).
NG indicates fail (no good).
Operation
1.
Press
Main
>
Configure
[F5] >
Go-NoGo
[F3] in
order.
2.
Set
SPEC Test
to ON.
When SPEC Test is ON, SPEC will appear in the
operation status panel of LCD display. This means the
unit is ready for Go-NoGo testing.
3.
Turn the load on.
The test starts from the time the load was turned on +
the Delay Time.
Display:
GO
0.000
V
0.0000
A
0.00
W
Level2
0.00
Level1
0.00
LOAD
RS232
01/Oct/2017
W
W
SPEC test = ON
SPEC
GO
Test result
Display:
NG
0.000
V
0.0000
A
0.00
W
Level2
0.00
Level1
0.00
LOAD
RS232
01/Oct/2017
W
W
SPEC test = ON
SPEC
NG
Test result
Summary of Contents for LSG-1050H
Page 24: ...14 GRA 414 E EIA standard 132 382 5 477 6 GRA 414 J JIS standard 149 382 5 477 6...
Page 185: ...175 7 6 Operating Area 7 6 1 LSG 175H H Range M Range L Range...
Page 186: ...176 7 6 2 LSG 350H H Range M Range L Range...
Page 187: ...177 7 6 3 LSG 1050H H Range M Range L Range...
Page 188: ...178 7 6 4 LSG 2100H H Range M Range L Range...
Page 204: ......