150
Operation
(2/2)
9.
On the slave units, press
Main
>
Configure
[F5] >
Next Menu
[F4] >
Parallel
[F1] in order,
and set
Operation
to
Slave
.
External
Previous
Menu
Booster
OFF
LOAD
RS232
01/Oct/2017
Parallel
Operation
3
Slave
Configure
A Value
Fine
CV
8.75A
80V
Fast
Knob
Parallel
When in Slave mode, all keys are locked, except for the
Scroll wheel and Enter key.
Caution
*Failing to remove the last ferrite core from the GTL-255
cable may reduce the stability of the units when used in
parallel.
4-2-4. Turning the Load On
Description
Operating the LSG-H Series in parallel operation is the
same as for single units.
Note
When using the units in parallel, the load line inductance
could be increased or the stability of the units could be
reduced. It may be necessary to reduce the response
speed setting to increase stability.
Operation
1.
Turn the slave and master units on.
2.
Set the operation mode and settings on the master unit.
The master’s settings will be used by the slave units.
3.
Turn the load on from the Master unit.
All measurements will be displayed and updated on the
Master unit only.
Summary of Contents for LSG-1050H
Page 24: ...14 GRA 414 E EIA standard 132 382 5 477 6 GRA 414 J JIS standard 149 382 5 477 6...
Page 185: ...175 7 6 Operating Area 7 6 1 LSG 175H H Range M Range L Range...
Page 186: ...176 7 6 2 LSG 350H H Range M Range L Range...
Page 187: ...177 7 6 3 LSG 1050H H Range M Range L Range...
Page 188: ...178 7 6 4 LSG 2100H H Range M Range L Range...
Page 204: ......