APPX
Appendix 4 Compliance with global standards
585
A
Check list for user documentation
Servo amplifier
Variable dimensions [mm]
Screw
size
a
a1
b
c
d
d1
e
e1
f
MR-J4-03A6
90
0.5
5
4
4
M4
MR-J4-10_(1)/MR-J4-20_(1)/
MR-J4-40_(1)/MR-J4-60_
6
6
156
0.5
6
M5
MR-J4-70_/MR-J4-100_
12
12
156
0.5
6
42
0.3
M5
MR-J4-200_(4)/MR-J4-350_
6
45
156
0.5
6
78
0.3
M5
MR-J4-500_
6
6
235
0.5
7.5
93
0.5
93
0.5
M5
MR-J4-700_
6
6
285
0.5
7.5
160
0.5
160
0.5
M5
MR-J4-11K_(4)/MR-J4-15K_(4)
12
12
380
0.5
10
196
0.5
196
0.5
M5
MR-J4-22K_(4)
12
12
376
0.5
12
236
0.5
236
0.5
M10
MR-J4-60_4/MR-J4-100_4
12
12
156
0.5
6
42
0.3
M5
MR-J4-350_4
6
6
235
0.5
7.5
93
0.5
93
0.5
M5
MR-J4-500_4
6
6
235
0.5
7.5
118
0.5
118
0.5
M5
MR-J4-700_4
6
6
285
0.5
7.5
160
0.5
160
0.5
M5
MR-J4W2-0303B6
6
6
156
0.5
6
M5
MR-J4W2-22B/MR-J4W2-44B
6
6
156
0.5
6
M5
MR-J4W2-77B/MR-J4W2-
1010B
6
6
156
0.5
6
73
0.3
M5
MR-J4W3-222B/MR-J4W3-
444B
6
6
156
0.5
6
73
0.3
M5
d
a
e
c
b
c
d1
a1
e1
f
MR-J4 installation checklist for manufacturer/installer
The following items must be satisfied by the initial test operation at least. The manufacturer/installer must
be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic inspection.
1. Is it based on directive/standard applied to the machine?
Yes [ ], No [ ]
2. Is directive/standard contained in Declaration of Conformity (DoC)?
Yes [ ], No [ ]
3. Does the protection instrument conform to the category required?
Yes [ ], No [ ]
4. Are electric shock protective measures (protective class) effective?
Yes [ ], No [ ]
5. Is the STO function checked (test of all the shut-off wiring)?
Yes [ ], No [ ]
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
Summary of Contents for MELSERVO-J4 series
Page 2: ......
Page 605: ...APPX Appendix 6 EC declaration of conformity 603 A ...
Page 638: ...636 APPX Appendix 14 Encoder output pulse setting method MEMO ...
Page 645: ......