GE Power Management
ALPS Advanced Line Protection System
C-21
APPENDIX C
C.3 POINT LISTS
C
68
51G Time Dial
69
Definite Time Delay
70
51G Reset Characteristic
71
Rated Per Unit Voltage
72
Select Phase Overvoltage
73
Phase Overvoltage Pickup
74
Phase Overvoltage Time Delay
75
Select Pos. Sequence Overvoltage
76
Inst. Pos. Sequence Overvoltage Pickup
77
TOV Pos. Seq. Overvoltage Pickup
78
Pos. Seq. Overvoltage Time Delay
79
Compensated Pos. Seq. OV
80
Compensated Pos. Seq. OV Impedance
81
Inst. Compensated Pos. Seq. OV Pickup
82
TOV Compensated Pos. Seq. OV Pickup
83
Compensated Pos. Seq. OV Time Delay
84
PTFF Blocking
85
Block Reclosing for any function
86
Block for Out of Step
87
Block for 3-Phase Faults
88
Block for 50G Trip
89
Block for Z2 Time Delayed Trip
90
Block for Z3 Time Delayed Trip
91
Block for Z4 Time Delayed Trip
92
Block for any Z1 Phase Fault
93
Block for any Z2 Phase Fault
94
Block for Configurable Trip Logic
95
Select Line Pickup
96
Bypass Line pickup time delay
97
I1 Pickup
98
Select Remote Open Detector
99
Remote Open Detector Time Delay
100
Select Line Overload protection
101
Level 1 Pickup Current
102
Level 2 Pickup Current
103
Level 1 Time Delay
104
Level 2 Time Delay
105
Select Scheme Logic
106
Select Number of Receivers
107
1-Phase/3-Phase Trip Mode
108
Select function to use to start carrier in Blocking scheme
109
Select Weak Infeed tripping for Hybrid Scheme
110
Trip Integrator
111
POTT Coord Timer PU
112
POTT Coord Timer DO
113
BKR1 b Switch Coord Timer PU
Table C–7: POINT LIST: OBJECTS 40 & 42 (Sheet 3 of 8)
ANALOG OUTPUT (OBJECT 40)
ANALOG OUTPUT BLOCK (OBJECT 41)
INDEX
DESCRIPTION
FORMAT / UNITS
REMARKS