Chapter 6 Fault Code Information and Maintenance
6-10
Terminals and wiring of main circuit
Check Items
Methods and Criterion
Maintenance
Period
Daily
Half
Year
One
Year
If the wiring shows change of
color change or deformation due
to overheat
Visual inspection
If the insulation of wiring is
damaged or the color has
changed
Visual inspection
If there is any damage
Visual inspection
DC capacity of main circuit
Check Items
Methods and Criterion
Maintenance
Period
Daily
Half
Year
One
Year
If there is any leakage of liquid,
change of color, cracks or
deformation
Visual inspection
Measure static capacity when
required
Static capacity
initial value X 0.85
Resistor of main circuit
Check Items
Methods and Criterion
Maintenance
Period
Daily
Half
Year
One
Year
If there is any peculiar smell or
insulator cracks due to
overheating
Visual inspection, smell
If there is any disconnection
Visual inspection or measure with
multimeter after removing wiring
b/B1 ~ -
Resistor value should be within
10%