![Amada S-2200CA Operation Manual Download Page 79](http://html1.mh-extra.com/html/amada/s-2200ca/s-2200ca_operation-manual_2915805079.webp)
CHAPTER 3: USING PROGRAMMING FUNCTIONS
IS-2200CA/4500CA INVERTER POWER SUPPLY
990-412
3-25
NOTE:
When
DELAY START SET
is 1ms or 2ms, the schedule number when the
2ND STAGE
signal is received is selected. Therefore, in Fig. A above, the schedule number is not selected
and the schedule signal input error occurs. When
DELAY START SET
is
1
ms or
2
ms, input the
schedule signal in advance before the
2ND STAGE
signal is received.
b. START SIGNAL MODE
Set the input method of the start signal to activate the Power Supply.
WHEN LATCHED.
The welding sequence halts if the
2ND STAGE
signal stops during
squeeze time (SQZ). The welding sequence proceeds to completion when the
2ND STAGE
signal stops during Weld 1 time (WE1) or later.
A
2ND STAGE
A: DELAY START SET
Schedule
selection
(1,2,4,8,16
32,64,128,P)
SQD
Welding sequence
SQZ
U
U
D
D
WE1
WE2
U
D
HO
CO1
CO2 WE3
B: Monitored value judgment
time
B C
C: END signal output
time
END signal output
Valve output
(SOL1 or SOL2)
WHEN PULSED.
When the
2ND STAGE
signal is input for more than the time set through
DELAY START SET
and then stops, the welding sequence will proceed to completion.
A
(1,2,4,8,16
32,64,128,P)
B C
Schedule
selection
Welding sequence
B: Monitored value judgment
time
C: END signal output
time
END signal output
Valve output
(SOL1 or SOL2)
2ND STAGE
A: DELAY START SET
SQD SQZ
U
U
D
D
WE1
WE2
U
D
HO
CO1
CO2 WE3
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......