CHAPTER 2: INSTALLATION AND SETUP
IS-2200CA/4500CA INVERTER POWER SUPPLY
2-6
990-412
8.
Connect the ground cable to the chassis ground terminal to the right of the circuit breaker.
9.
Slide the circuit breaker terminal cover back on to the circuit breaker.
10.
Remove the four screws that secure the Line-Out Cover Plate on the bottom of the Power
Supply.
11.
Drill appropriate hole(s) in the plate to receive the weld transformer power conduit(s).
NOTE: Remove all metal shards,
then re-install the plate.
12.
Install the weld transformer conduit to the plate and feed cables into the Power Supply.
13.
Connect the ground cable to the ground lug.
14.
Connect the two transformer cables to connectors labeled
U
and
V
in the power module.
(
see next page
)
INPUT POWER CONNECTIONS (3Ø)
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......