CHAPTER 4: OPERATING INSTRUCTIONS
IS-2200CA/4500CA INVERTER POWER SUPPLY
990-412
4-3
If no error is detected in Step 2, ensure that the three
READY
requirements are met:
•
The Power Supply
WELD ON/OFF LED
must be ON.
•
The
ON/OFF
setting of the Pendant must be set to ON.
•
An external
WELD ON/OFF
signal must be present at the I/O terminal block.
3.
Check that the Power Supply green
READY
lamp is lit
4.
Start the weld sequence and confirm that the welding current is flowing normally by checking
the red
WELD
lamp and the Monitor screen.
5.
Make any necessary adjustments to the schedule so that the work piece will be properly welded.
6.
When welding multiple work pieces according to multiple schedules, change the
SCHEDULE #
and set new time and welding current.
7.
Set the upper and lower limits on the Pendant
MONITOR SET
screen for each
SCHEDULE
#.
8.
Begin welding following normal procedures. Adjust the
SCHEDULE
settings as necessary.
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......