APPENDIX C: SYSTEM TIMING
IS-2200CA/4500CA INVERTER POWER SUPPLY
990-412
C-5
Two-Stage Start
When the 1ST STAGE is input, the solenoid valve output (SOL1 or SOL2) is turned ON and goes in to
the standby state of the 2ND STAGE input. When the 2ND STAGE is input, welding sequence starts.
TW
SQD
SQZ
A
HO
WELD
SOL1/SOL2
2ND STAGE
1ST STAGE
We ld ing current
TW: 2ND STAGE input standby state.
A: DELAY START SET s Welding preparation time.
When the 2ND STAGE is input before the 1ST STAGE input, welding sequence starts. When welding
sequence starts, 1ST STAGE signal is not received until welding sequence ends.
SQD
SQZ
A
HO
WELD
SOL1/SOL2
2ND STAGE
1ST STAGE
We ld ing current
A
: DELAY START SET s Welding preparation time.
Two-Stage Start
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......