APPENDIX D: WIRE GAUGE AND CIRCUIT BREAKER SELECTION
IS-2200CA/4500CA INVERTER POWER SUPPLY
D-2
990-412
Example:
Using the table below:
•
If a 100amp output current at 100% duty cycle is required, the I
EFF
is 100amps.
•
For the Transformer lines: use a 3/0 cable with a maximum length of 80 feet.
•
For the AC lines: use 1/0 cable with a maximum length of 282 feet.
PRIMARY CURRENT VS WELD DUTY CYCLE
CABLE TO OUTPUT
TRANSFORMER
CABLE TO UNIT
(480 VAC INPUT)
Output
Current
Weld Duty
Cycle (%)
I
EFF
I
PH
AWG @
I
EFF
Amps
1% Drop
(feet)
AWG @
I
PH
5% Drop
(feet)
*500
15
194
158
3/0
80
1/0
282
*400
24
196
160
3/0
80
1/0
282
*280
50
198
162
3/0
80
1/0
282
*200
100
200
163
3/0
80
1/0
282
150
100
150
123
1
40
2
170
100
100
100
82
3
25
4
110
50
100
50
41
8
8
8
45
* Maximum output current at rated duty cycle.
* Rated capacity at 25
°
C.
NOTES:
•
For other output currents see the table on the next page.
•
For other output currents at different duty cycles, apply the above formula to find the new I
EFF
,
the use the following table for cable sizes and maximum lengths.
•
If I
EFF
is not in the table, use the next higher current.
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......