CHAPTER 3: USING PROGRAMMING FUNCTIONS
IS-2200CA/4500CA INVERTER POWER SUPPLY
3-46
990-412
12. PRECHECK Screen
Screen for setting the weld time and pulse width for resistance pre-check welding. The resistance
pre-check welding is a function to apply a small current under constant voltage control before
regular welding to confirm that the part to weld is set correctly by means of the measured current
value. To use the pre-check function, the secondary current (voltage) needs to be monitored.
a. SCHEDULE #
Select from #1 to #255 to set the
SCHEDULE
. Normally select #1 first, then select additional
schedules in sequential order.
b. PRECHECK TIME
Set the weld time. Pre-check is not performed at 0ms.
c. PRECHECK HEAT
Set the welding pulse width.
d. PRECHECK RESISTANCE HIGH
Set the upper limit of resistance value for pre-check.
e. PRECHECK RESISTANCE LOW
Set the lower limit of resistance value for pre-check.
f. PRECHECK MONITOR
Displays the monitor resistance value at the pre-check welding.
(b)
(c)
(d)
(e)
(f)
(a)
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......