![Amada S-2200CA Operation Manual Download Page 48](http://html1.mh-extra.com/html/amada/s-2200ca/s-2200ca_operation-manual_2915805048.webp)
CHAPTER 2: INSTALLATION AND SETUP
IS-2200CA/4500CA INVERTER POWER SUPPLY
2-10
990-412
Section III: Installation of IS-4500CA
WARNING
•
Make sure the mounting location can support the
weight
of the unit.
•
A mechanical lift or hoist should be used for unpacking and installation due to
the weight of the unit!
•
Protect electronic components from metal shards when drilling pilot holes or
punching holes in the cover plates to connect external equipment. We
recommend removal of the plates before drilling and punching, but if plates
cannot be removed, be sure
all
metallic shards from the Power Supply after
completion of the work.
Unpacking
Unpack the Power Supply from its shipping crate. Carefully save and store packing materials for future
storage or shipment of the Power Supply.
Installation
Installation consists of mounting the unit and making power, signal, and cooling water connections. Holes
must be drilled into the Power Supply in order to install the Input and Output Power cables.
Mounting the Power Supply
The unit is free standing on legs. The legs need to be bolted to the floor for safety.
As each installation is different, no mounting hardware is provided with the unit. You will need to
provide the appropriate screws or bolts, flat and lock washers, and nuts.
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......