CHAPTER 3: USING PROGRAMMING FUNCTIONS
IS-2200CA/4500CA INVERTER POWER SUPPLY
3-14
990-412
4. MONITOR Screen
In this screen, you can confirm the operational conditions during welding. Monitored data is
displayed for each
SCHEDULE
.
(b)
(c) (d) (e)
(f)
NOTE:
The screen shows the settings for 10 kA or 05 kA range. In 20 kA, 40 kA, or 80 kA range,
CURRENT is 000.0 kA to 999.9 kA and POWER is 000.0 kW to 999.9 kW.
a. SCHEDULE #
Set the No. of the
SCHEDULE
to monitor. The measured values (welding current, voltage, etc.)
for welding within that
SCHEDULE
are displayed. The Power Supply stores the latest measured
values of each
SCHEDULE
number. The stored measurement values are not erased even when
the power is turned off, and thus can be checked for the next job.
b. TIME
The lengths of periods during which current was supplied in the course of
WELD1
,
WELD2
and
WELD3
operations are displayed. The latest measured value welded with the displayed
SCHEDULE
No. is displayed. As units of time, ms and CYC may be selected. Either unit can
be selected via the
MODE SELECT
screen.
c. CURRENT
The current during which current was supplied in the course of
WELD1
,
WELD2
and
WELD3
operations are displayed. The latest measured value welded with the displayed
SCHEDULE
No. is displayed.
(g)
(h)
(i)
(k)
(l)
(a)
(j)
Summary of Contents for S-2200CA
Page 1: ...990 412 REV G INVERTER POWER SUPPLY IS 2200CA 4500CA OPERATION MANUAL...
Page 20: ......
Page 31: ...CHAPTER 1 SYSTEM DESCRIPTION IS 2200CA 4500CA INVERTER POWER SUPPLY 990 412 1 11...
Page 38: ......
Page 114: ......
Page 136: ......
Page 168: ......