
Ditching work
Install a proper bucket for ditching. Place the
machine where the ditching is performed
effectively.
In case of a wide ditch, dig both sides in first, and
then dig the center area.
Loading work
Position the hauler or truck so as to achieve a small
slewing movement and good visibility for the
operator to work effectively.
Also load over the rear side of the dump truck rather
than over the side, as this makes the operator work
easier and increases efficiency.
V1078415
V1158800
Operating techniques
Buckets
205
Содержание EC60E
Страница 1: ...VOLVO CONSTRUCTION EQUIPMENT ec60E operator s manual ...
Страница 5: ......
Страница 9: ......
Страница 99: ...Instrument panel rear Audio system optional equipment See page 126 98 Instrument panels Instrument panel rear ...
Страница 341: ...340 Alphabetical index ...
Страница 342: ...Ref No 20044040 C 2018 05 Volvo Changwon ...