
Underground cables and pipes
Make sure that authorities or companies
responsible for cables and pipes have been
contacted and that their instructions are followed.
Also check which rules apply to ground personnel
regarding exposing cables and pipes. Normally only
the service companies' own personnel may expose
and arrange provisional suspension of cables.
Make use of a signal man when you cannot see the
actual point where you are working or when the
position of the pipe or cable is critical, see page
226
. The position of the pipe or cable may deviate
from the drawing or distances may be incorrectly
determined. Regard all electrical cables as live.
184
Operating techniques
Working within dangerous areas
Содержание EC60E
Страница 1: ...VOLVO CONSTRUCTION EQUIPMENT ec60E operator s manual ...
Страница 5: ......
Страница 9: ......
Страница 99: ...Instrument panel rear Audio system optional equipment See page 126 98 Instrument panels Instrument panel rear ...
Страница 341: ...340 Alphabetical index ...
Страница 342: ...Ref No 20044040 C 2018 05 Volvo Changwon ...