
Unloading
1 Place the trailer on a firm and level ground.
2 Apply the brake of the trailer.
3 Insert blocks in front of and behind the tyres of
trailer.
4 Fix loading ramp securely.
5 Raise excavating equipment and dozer blade,
rotate the superstructure by 180 degrees.
6 Slowly drive to the beginning of the ramp, extend
the excavating equipment position (B) and drive
forwards until the machine tips on to the ramp.
7 Drive down slowly until the machine reaches
level ground.
If the machine is too high to fit in the transporting
vehicle it is possible to remove the rotating beacon
(optional equipment). This will reduce the total
height of the machine.
Rotating beacon and satellite antenna,
folding
When transporting the machine, fold the rotating
beacon and satellite antenna not to be damaged.
V1158798
B
V1078746
Operating instructions
Transporting machine
169
Содержание EC60E
Страница 1: ...VOLVO CONSTRUCTION EQUIPMENT ec60E operator s manual ...
Страница 5: ......
Страница 9: ......
Страница 99: ...Instrument panel rear Audio system optional equipment See page 126 98 Instrument panels Instrument panel rear ...
Страница 341: ...340 Alphabetical index ...
Страница 342: ...Ref No 20044040 C 2018 05 Volvo Changwon ...