
- 75 -
C
h
ap
ter
6
-
75
-
6-2 Test Run
Operation command values can be changed using the status of multifunctional input terminals. According to the
status of multifunctional input ROPE or RCOM, the operation commands as shown in the table below can be
selected. See F1101 in Chapter 7-3 for details.
ROPE
terminal
RCOM
terminal
R3W
terminal
Operation Command
OFF
OFF
*
The method selected by F1101
ON
OFF
*
Operation Panel
OFF
ON
*
Communication
ON
ON
OFF
Terminal block (FR terminal or RR terminal)
ON
ON
ON
Terminal block (3wire) (RUN terminal or STOP terminal)
*
Both of ON and OFF will be the same operation.
6-2-8
Operation Confirmation
After setting has been made by following the steps for test run, the operation shall be confirmed as follows.
Once the inverter or motor is in abnormal conditions, please stop operating immediately. See [Chapter 9 Fault
Analysis] for details.
(1) Test run steps
Please refer to the operation methods of operation panel for implementation of 5Hz operation.
Table 6-10 Test run steps
Operation
Display
1
Power supply input
2
press press
3
4
*The state where F1101 (operation command selection) is set to 1 (operation by operation panel)
①
After power input, check that the frequency ― ‖ displayed on the operation panel is flashing.
②
Set the frequency to a low frequency of about 5Hz through the quick knob . (Check that the set
frequency displayed on LED monitor is flashing)
③
Press (Drive) key to start forward running operation.(Check that the set frequency displayed on
LED monitor is flashing)
④
Press (Stop) key to stop operation of the equipment.
Содержание SVCO6
Страница 1: ...High Performance Vector Control Inverter Instruction Manual SANKEN ELECTRIC CO LTD ...
Страница 2: ......
Страница 324: ... 322 Memorandum ...
Страница 325: ......