1.3 Entire Workflow
8
1.3 Entire Workflow
See
3.1 "Pre-Operation Inspection" (p. 23)
Be sure to perform pre-operation inspection prior to measurement.
Check the power voltage.
Connect the power cord.
Connect the probes or fixture (option) to the measurement terminals.
Turn the power on.
Connect the sample.
Prepare the unit, fixture, and sample.
Connect the fixture to the measurement terminals.
Set the measurement conditions.
Connect the sample to the fixture.
Check the measurement results.
Measurement Preparations
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
See
Chapter 2 "Measurement Preparations" (p. 17)
Basic Measurement
See
3.2 "Measurement Example" (p. 24)
Pre-Operation Inspection
Содержание 3504-40 C HiTester
Страница 2: ......
Страница 22: ...1 4 Names and Functions of Parts 16 ...
Страница 28: ...2 5 Turning the Power On and Off 22 ...
Страница 40: ...3 3 Setting the Measurement Conditions 34 OF UF Evaluation Flow Chart ...
Страница 66: ...4 4 Self Calibration 60 ...
Страница 96: ...5 2 BIN Measurement Function Model 3504 50 3504 60 only 90 ...
Страница 136: ...7 4 About Measurement Times 130 ...
Страница 279: ...Appendix 5 External View Appendix A7 Appendix 5 External View Unit mm 220 3 260 1 100 1 32 5 25 21 54 20 5 95 5 15 ...
Страница 286: ...Appendix 7 Initial Settings Table A14 ...
Страница 289: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......