Engine
94
Exhaust Clamp Installation
If your bus has aluminized steel band clamps installed, do not reuse
them. If you remove them, these clamps must be replaced with stainless
steel band clamps, available through your Gillig Parts representative.
To achieve a proper seal, make sure that the step on the V-groove
installation indicator matches the step on the exhaust clamp.
1. Refer to Figure 3-13. Position the band clamp over the smallest tube. The larger end of the clamp
must be on the overlapping tube or flex.
2. Locate the step of the clamp to the overlapping tube at the joint.
3. Using the V-groove as a visual guide, alternately tighten bolts until the V-groove installation
indicator is approximately half closed (60 ft-lb / 81 N-m torque maximum).
Before
After
V-Groove
Installation
Indicator
Figure 3-13, Band Clamp
Содержание LOW FLOOR
Страница 18: ...Specifications 18...
Страница 58: ...Preventive Maintenance 58...
Страница 110: ...Engine 110...
Страница 138: ...Transmission Driveline Rear Axle 138...
Страница 182: ...Suspension 182...
Страница 260: ...Air System 260...
Страница 420: ...Electrical System 420 Deutsch DT Series Connectors...
Страница 421: ...Electrical System 421...
Страница 422: ...Electrical System 422 Deutsch HD 10 Series Connectors...
Страница 423: ...Electrical System 423...
Страница 424: ...Electrical System 424 Deutsch HD 30 Series Connectors...
Страница 425: ...Electrical System 425...
Страница 442: ...Heating Air Conditioning 442...
Страница 486: ...Body and Interior 486 Driver s Seat Troubleshooting Use the following chart to troubleshoot the USSC seat...
Страница 492: ...Body and Interior 492 Figure 11 33 USSC Seat Assembly...
Страница 493: ...Body and Interior 493 Figure 11 34 USSC Seat Suspension Assembly...
Страница 495: ...Body and Interior 495 Figure 11 37 Seat Air Connections...
Страница 506: ...GILLIG CORPORATION 25800 Clawiter Road Hayward CA 94545 Phone 510 785 1500 Fax 510 785 6819 Printed November 2006...