Electrical System
37
Alternator Cable/Fuse Installation Procedure
Always shut off power to the batteries whenever performing any
electrical maintenance or repairs.
Because of heat, vibration, and proximity of other maintenance procedures, you will need to establish
a PM schedule for checking all cable connections in the engine compartment. Inspect cables for dam-
aged heat-shrink tubing, cracking, chafing, or any other kind of damage. Make sure cable connections
are tight and check for broken studs. A suggested interval is given in the
Preventive Maintenance
chapter
of this manual. Whenever service is performed in the engine compartment, inspect the condition of all
cables and cable connections.
It is critical that correct torque be maintained on jamb nuts, cable
clamping nuts, and all other nuts on the fuse block studs.
When servicing alternator cables and fuses, keep these important tips
in mind:
• Keep cables either vertical or horizontal to prevent interference with
the fuse insulator.
• Never install small wire rings between any large cable lug and fuse.
• Use only stainless steel flat washers, and do not use “star” washers.
• Stainless steel washers should be used only to back up a connection,
and never as a current carrying component.
• Don’t use
any
washers between the lug and the fuse or between the lug
and the buss bar.
• Make certain that the buss bar and the lug have good contact surface,
and the lug and the fuse have good contact surface as well.
•
Always hold lower nut while upper nut is torqued!
• Replace fuses only with fuses of the same amperage. Contact your
Gillig Service representative for the correct fuses.
To install cables and fuses, refer to Figure 9-15 and follow these guidelines:
1. Lightly coat cable connections with copper shield and torque to 140 in-lb.
2. Install buss bar, fuses, clamp, cables, nuts, and washers in the sequence shown. Torque to
140 in-lb.
Содержание LOW FLOOR
Страница 18: ...Specifications 18...
Страница 58: ...Preventive Maintenance 58...
Страница 110: ...Engine 110...
Страница 138: ...Transmission Driveline Rear Axle 138...
Страница 182: ...Suspension 182...
Страница 260: ...Air System 260...
Страница 420: ...Electrical System 420 Deutsch DT Series Connectors...
Страница 421: ...Electrical System 421...
Страница 422: ...Electrical System 422 Deutsch HD 10 Series Connectors...
Страница 423: ...Electrical System 423...
Страница 424: ...Electrical System 424 Deutsch HD 30 Series Connectors...
Страница 425: ...Electrical System 425...
Страница 442: ...Heating Air Conditioning 442...
Страница 486: ...Body and Interior 486 Driver s Seat Troubleshooting Use the following chart to troubleshoot the USSC seat...
Страница 492: ...Body and Interior 492 Figure 11 33 USSC Seat Assembly...
Страница 493: ...Body and Interior 493 Figure 11 34 USSC Seat Suspension Assembly...
Страница 495: ...Body and Interior 495 Figure 11 37 Seat Air Connections...
Страница 506: ...GILLIG CORPORATION 25800 Clawiter Road Hayward CA 94545 Phone 510 785 1500 Fax 510 785 6819 Printed November 2006...