GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 213
8-9-3-2
BEP installation
Table 8-127 BEP installation
Steps
Corresponding Graphic
1.
Disconnect:
• the battery cable from
PCN1
.
• the CB to PB cable from
PCN2
.
Place the BEP cover aside.
BEP6 CB cables
2.
Re-install the following parts into the replacement BEP:
• Option Dongle
• Printer Tray and/or the Printer or the Shear Wave Capacitor Pack if Shear Wave option was
installed.
• BackPlane to BEP cable
• Wireless Card and Antennas, if present
• Patient I/O, if present
• S Video Card, if present
• Shear Wave Capacitor Pack
3.
Slide the BEP into the left side of the chassis frame.
4.
Install the two HEX key screws at the inside
base of the BEP (Torque: 10 Nm
{7.4 lbf-ft}).
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......