GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 123
8-6-4-5
Functional Checks
Perform the following functional tests to confirm the LOGIQ E9 is operational before returning the
LOGIQ E9 to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required tests and is ready for use.
Table 8-76 V2 LCD Arm Adapter replacement Functional Checks
See:
Section
Functional Checks
Debrief Script
4-2-2
Power ON/Boot Up
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
4-2-3
Power shut down
4-2-4
Top Console position adjustment
4-3-5
B-Mode Checks
4-3-7
System CFM and PWD Checks
6-3-4
LCD Adjustment Procedure
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......