GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 239
8-9-9
BEP Battery Pack replacement - R4.x and later
Table 8-151 Manpower / Time and Tools
Manpower /
Time
Tools
One person /
15 minutes
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
.
Table 8-152 Preparations and Preparation Links
Preparations - you must perform the following steps
WARNING
WARNING
RISK OF ELECTRICAL SHOCK, SYSTEM MUST BE TURNED OFF. AVOID ALL
CONTACT WITH ELECTRICAL CONTACTS, CONDUCTORS AND COMPONENTS.
ALWAYS USE NON-CONDUCTIVE HANDLES DESIGNED FOR THE REMOVAL AND
REPLACEMENT OF ESD SENSITIVE PARTS. ALL PARTS THAT HAVE THE
POTENTIAL FOR STORING ENERGY MUST BE DISCHARGED OR ISOLATED
BEFORE MAKING CONTACT.
IF THE SHEAR WAVE OPTION IS PRESENT, MAKE SURE THE LEDS ON THE
CAPACITOR PACK ARE OFF BEFORE DISCONNECTING THE CAPACITOR PACK
CABLES.
WARNING
WARNING
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO TAKING
THE NECESSARY ESD PRECAUTIONS.
1. ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED
ESD CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (NEAR THE
POWER CONNECTOR).
2. FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC
SENSITIVE EQUIPMENT.
WARNING
WARNING
THE WASTE OF ELECTRICAL AND ELECTRONIC EQUIPMENT MUST NOT BE
DISPOSED AS UNSORTED MUNICIPAL WASTE AND MUST BE COLLECTED
SEPARATELY.
CONTACT THE MANUFACTURER OR OTHER AUTHORIZED DISPOSAL COMPANY
TO DECOMMISSION YOUR EQUIPMENT.
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......