GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 192
Section 8-8 - Casters and Brakes replacement
Section 8-8
Casters and Brakes replacement
8-8-1
Purpose of this section
This section describes how to replace the replaceable parts for the Casters and Brakes.
8-8-2
Rear Casters replacement
8-8-2-1
Manpower
Two people, 15 minutes.
8-8-2-2
Tools
For tools needed, refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
.
NOTE:
This procedure requires an extended HEX key (UNBRAKO / ALLEN key) due to the high torque:
130 Nm {95.9 lbf-ft}.
8-8-2-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove both Side Covers.
5.) Remove the Rear Bumper.
6.) Remove the Rear Cover.
Follow these links if you need more information:
•
4-2-3 "Power shut down" on page 4-7.
•
8-5-2-1 "Side Covers removal" on page 8-31.
•
8-5-14 "Rear Bumper replacement" on page 8-64.
•
8-5-11 "Rear Cover replacement" on page 8-54.
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......