Chapter 8 Replacement procedures
8 - 173
8-6-15
Probe Cable Hooks replacement
8-6-15-1
Manpower
One person, 15 minutes.
8-6-15-2
Tools
For tools needed, refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
.
8-6-15-3
Probe Cable Hook removal
1.) Unscrew the fastening screw.
The screw may be locked with Lock-Tite, so you may need to apply a little extra force.
2.) Remove the Cable Hook.
8-6-15-4
Probe Cable Hook installation
1.) Position the Probe Cable Hook (Figure 8-55).
2.) Fix it in place by using an M5x20 screw with an M6 washer. Lock-Tite has to be used.
Torque: 50 Ncm (0.37 lbf-ft or 4.4 lbf-in) (fingertight).
Figure 8-55 Screw placement, Probe Cable Hook
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......