GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 10 Care & Maintenance
10 - 3
Section 10-4
System maintenance
10-4-1
Preliminary checks
The preliminary checks take about 15 minutes to perform. Refer to the Ultrasound system user
documentation whenever necessary.
Table 10-2 System preliminary checks
Step
Item
Description
1.
Ask and Listen
Ask the customer if they have any problems or questions about the equipment.
2.
Paperwork
Fill in the top of the EQC inspection form. Record all probes and Ultrasound system options.
3.
Power up
• Turn the Ultrasound system power on and verify that all fans and peripherals turn on.
• Watch the displays during power up to verify that no warning or error messages are displayed.
• Where applicable, confirm that the battery is charged. If no AC Input present, use the internal
battery.
4.
Probes
Verify that the Ultrasound system properly recognizes all probes.
5.
Displays
Verify proper display on the monitor and touch panel (where present).
6.
InSite
Where applicable, for Warranty and Contract Customers only:
• Verify that InSite is functioning properly.
• Ensure two-way remote communications.
7.
Review
Error Logs
Where applicable, Error Logs can be reviewed via system diagnostics.
8.
Diagnostics
Optional.
9.
Presets
Backup all Customer Presets to an appropriate media.
10.
Image Archive
Back up the Image Archive onto appropriate media.
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......