Section 8-10 - Main Power Supply parts replacement
8-10-4-5
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-10-4-6
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-10-4-7
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required checks and is ready for use.
Table 8-169 4D Motor Controller (Cherokee Power Supply) replacement Functional
Checks
See:
Section
Functional Check
Debrief Script
4-2-2
Power ON/Boot Up
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
4-2-3
Power shut down
4-3-14
Probe/Connectors Checks
4-3-5
B-Mode Checks
4-3-7
System CFM and PWD Checks
4-3-18
Mechanical Function Checks
10-6-4
Grounding continuity
10-6-5
Chassis leakage current test
Perform a 4D sweep
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......