GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 69
8-5-16
Rear Handle replacement
8-5-16-1
Manpower
One person, 15 minutes.
8-5-16-2
Tools
For tools needed, refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
.
8-5-16-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove the Side Covers.
5.) Remove the Rear Cover.
6.) Remove the Top Cover.
Follow these links if you need more information:
•
4-2-3 "Power shut down" on page 4-7.
•
8-5-2 "Side Covers replacement" on page 8-30.
•
8-5-11 "Rear Cover replacement" on page 8-54.
•
8-5-4 "Top Cover replacement" on page 8-38.
8-5-16-4
Rear Handle removal
1.) Remove the two upper screws (
1
), one on each side.
2.) Remove the four hexcap screws (
2
), two on each side.
3.) Lift the Rear Handle away.
Figure 8-28 One Phillips and two hexcap screws on each side (left side illustrated)
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......