GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 110
Section 8-6 - Replacing Top Console Parts
6.
After plugging in the LCD Cable, bend the
cable as shown, pull with your index finger
and push with your thumb. The “S” bend
allows the cable to flex in the up direction
when the Bulk Head Cover is installed.
Install the Bulkhead Cover.
7.
Remove the shipping wrap, if present. DO NOT damage the surface of the Arm Assembly.
8.
Install the Bulkhead Cover.
9.
Perform Functional Checks. See:
8-6-3-4 - Calibration and adjustments
,
8-6-3-5 - Verification
and
8-6-3-6 "Functional Checks" on page 8-117
.
Table 8-68 LCD Monitor V2 Arm assembly installation - R4
Steps
Corresponding Graphic
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......