GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 84
Section 8-5 - Replacing Covers and Bumpers
8-5-21
Bulkhead Cover replacement
8-5-21-1
Manpower
One person, 15 minutes.
8-5-21-2
Tools
No tools are needed to replace the Bulkhead Cover.
8-5-21-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system.
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
Follow this link if you need more information:
4-2-3 "Power shut down" on page 4-7
.
8-5-21-4
Bulkhead Cover removal
1.) At the rear of the system, release the console’s frogleg mechanism by inserting a screwdriver into
the release point and pressing until release. Pull the console out to its extended position to gain
access to the screws in the next step.
Figure 8-38 XY / Frogleg mechanism release
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......