GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 248
Section 8-10 - Main Power Supply parts replacement
1.
Reconnect the Mains PS Cable and all
cables -
AC Output to Peripherals, Printer, Power to
BEP and USB on top of the Main PS.
If the Shear Wave option is installed,
reconnect the cable that supplies voltage to
the Capacitor Pack.
(Cherokee/Mitra) PS connectors
(Lambda) PS connectors without Shear Wave option
(R4 and earlier)
(Lambda) PS connectors with Shear Wave option
(R5 and later)
PCIe Cable routed between Card Cage and Targa (right side
view). GFI Configuration only. MRX does not use this cable.
2.
Install the Rear Cover, Top Cover and Side Covers.
3.
Perform Functional Checks. See:
8-10-2-3 - Calibration and adjustments
,
8-10-2-4 - Verification
and
8-10-2-5 "Functional Checks" on page 8-249
.
Table 8-159 Main PS installation
Steps
Corresponding Graphic
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......