GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 247
8-10-2-2
Main PS installation
NOTE:
If the 4D MC option was installed, make sure to reinstall the option into the new replacement
PS.
Table 8-159 Main PS installation
Steps
Corresponding Graphic
1.
Make sure the GFI PCIe cable is routed
behind the Main PS fang. GFI
Configuration only. MRX does not use this
cable.
Slide the Main PS (
1
) forward to seat the
connectors (
2
) on the Card Cage.
Engage the tab onto the Fang, from where
it was removed.
Install the three screws (
3
) that secure the
Main PS using a 5 mm Allen wrench
(Torque: 10 Nm {7.4 lbf-ft}).
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......