GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
8 - 108
Section 8-6 - Replacing Top Console Parts
2.
Take the LCD Arm and Cable Assembly
and feed the LCD Power Cable into the
Adapter first.
Position the Video Cable Connector as
shown and continue to feed the cables into
the Adapter.
Install the Arm Assembly.
3.
Position the Arm Assembly so the Set
Screw mounting hole faces the left side of
the LOGIQ E9.
Install the Set Screw. Torque: 9.8 Nm
(7.2 lbf-ft {86.4 lbf-in}).
Table 8-68 LCD Monitor V2 Arm assembly installation - R4
Steps
Corresponding Graphic
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......