GE
D
IRECTION
5535208-100, R
EV
. 2
LOGIQ E9 S
ERVICE
M
ANUAL
Chapter 8 Replacement procedures
8 - 73
8-5-18
Column Cover Assembly replacement
8-5-18-1
Manpower
One person, 15 minutes.
8-5-18-2
Tools
For tools needed, refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page 8-5
.
•
Flexible shaft bit driver extension (optional)
8-5-18-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove the Side Covers.
5.) Remove the Top Cover.
Follow these links if you need more information:
•
4-2-3 "Power shut down" on page 4-7.
•
8-5-2 "Side Covers replacement" on page 8-30.
•
8-5-4 "Top Cover replacement" on page 8-38.
8-5-18-4
Column Cover Assembly removal
1.) Lower the console to lowest possible level.
2.) Remove the lower screw on the right side that is visible near the rear of the DVD drive.
Figure 8-29 With console lowered, lower right side screw placement
Содержание 5205000
Страница 1: ...10 20 14 GEHC_FRNT_CVR FM LOGIQ E9 SERVICE MANUAL Part Number 5535208 100 Revision Rev 2 ...
Страница 2: ......
Страница 21: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 19 ZH CN KO ...
Страница 198: ...GE DIRECTION 5535208 100 REV 2 LOGIQ E9 SERVICE MANUAL 4 54 Section 4 8 Site Log This page was intentionally left blank ...
Страница 807: ......
Страница 808: ......