3. Installation
3.1 Step by Step Installation Procedure
The above list indicates the order in which the individual work operations are normally carried
out but this order may be varied where local conditions warrant such a change
Determination of division of work
Preparation of contract drawings
Sleeve and insert work
Installation of indoor unit
Refrigerant piping work
Drain pipe work
Duct work
Heat insulation work
Prework
Work
<
Operations
>
<
Points
>
Indicate clearly who is to be responsible for switch
settings.
Make relationship between outdoor, indoor, remote
control and option connections clear. (Prepare control
diagrams).
Take account of gradient of drain piping.
Check model name to make sure the fitting is made
correctly.
Special attention to dryness, cleanness and tightness.
Adjust to downward gradient.
Make sure airflow is sufficient.
Make sure no gaps are left where the insulating
materials are joined.
Multiple core cable must not be used. (Suitable cable
should be selected).
Must be carried out in strict accordance with control
circuit diagrams.
The foundation must be level.
Avoid short circuits and ensure sufficient space is
allowed for servicing.
Must be carried out in strict accordance with control
circuit diagrams
(Sequence start, low noise input, Cooling/Heating
selection refrigerant piping lenght etc.).
In the final check for 24 hours at 3.80 MPa there must
be no drop in pressure.
The vacuum pump used must have a capacity of
reaching at least 5mmHg
The amount of refrigerant to be added to the unit should
be calculated and written on th “Added Refrigerant” plate
and attached to the rear side of the front cover.
Make sure there are no gaps left between the decoration
panel and ceiling
Run each indoor unit in turn to make sure the pipework
has been fitted correctly
Explain the use of the system as clearly as possible to
your customer and make sure all relevant documentation
Electrical work (connection circuits
and drive circuits)
Setting of indoor unit setting
switches
Outdoor unit foundation work
Installation of outdoor unit
Setting of outdoor unit setting
switch
Air tight test
Vacuum drying
Additional charge of refrigerant
Fit decoration panels
Test run adjustment
Transfer to customer with explana-
tion
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...