SiEN34-705
Appendix
General Information
145
7.9 Outdoor Unit Multi Connection Piping Kit
7.9.1 BHFP22P100 · 151
This kit contains the following parts.
<Do not throw away any of the accessories until installation is complete>
Component parts
Kit
name
BHFP
22
P100
BHFP
22
P151
Caution
•
Please be sure to read this manual before installation and follow the instruction carefully when performing installation work.
•
See the outdoor unit’s installation manual for outdoor unit installation.
•
Installation of interconnecting piping between the outdoor units, REFNET joint or REFNET header will be needed separately
Gas-side joint
Liquid-side joint
Gas-side reducer
Liquid-side reducer
insulating
tube for
gas pipe
insulating
tube for
liquid pipe
Big
Big
Small
Small
Shape
Number of outdoor units connected
Outdoor unit Multi Connection Piping Kit
Selection Procedure
2 units
BHFP22P100
3 units
BHFP22P151
•
2 or 3 outdoor units can be connected.
• There are restrictions on the combination and the installation order of outdoor units,
so please refer to “the Engineering Data of VRV III” and “the installation manual”
(attached sheet of outdoor unit) for details.
The following parts are needed to connect
this kit and are not included
Field supply parts
Selection Procedure
See the “Connecting Pipe Sizes and location of cutting the joint” for
details on the necessary size.
Prepare a gas pipe diameter for the upper outdoor unit as listed in
“Connecting Pipe Sieze and location of cutting the joint.”
For insulation materials
Q’ty
Name
Insulation for piping
Connection piping
Elbow
Tape
1set
1pc
1set
Field supply parts
•
Quantity and selection procedure of elbow only applies to a front or bottom connection.
•
For a lower front connection the quantity and selection procedure are different, so please refer to the instructions for
a lower front connection.
•
A joint for the same diameter pipes is needed only for a bottom connection.
See the instructions for the bottom connection, for details on quantity and specifications.
•
The min. thickness of the pipes in this manual shows the requirements of Japanese High Pressure Gas Control low.
(As of Jan. 2003)
•
And the temper grade (O,1/2H) shows the material type of JIS h 3300. The tickness and material shall be selected in
accordance with local for the design pressure 4.OMPa (40bar).
(Unit : mm)
Caution
Temper grade
Copper tube O.D.
Copper tube W.T.
(Minimum requirement
O Type
1/2H Type
Ø
6.4
Ø
0.80
Ø
15.9
Ø
0.99
Ø
9.5
Ø
0.80
Ø
12.7
Ø
0.80
Ø
22.2
Ø
0.80
Ø
19.1
Ø
0.80
Ø
25.4
Ø
0.88
Ø
28.6
Ø
0.99
Ø
31.8
Ø
1.10
Ø
34.9
Ø
1.21
Ø
41.3
Ø
1.43
Ø
38.1
Ø
1.31
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...