• Remove the knockout plate on the bottom frame. (See the installation manual attached to the outdoor unit)
• Connect the gas and liquid pipe as shown in the figure below. (When connecting the pipes, first connect the gas-side joint and the gas-side
reducer (1), the liquid-side joint and the liquid-side reducer (1)).
• See the caution section in the installation manual attached to the outdoor unit for brazing pipes and connecting pipes with flare nuts.
• Install the joint in such a way that the attached face of the caution label becomes horizontal. (See the view A)
• Connect the liquid side reducer (1) tilting approx. 10° and bend the field supplied liquid pipe up to the stop valve as shown in the figure below.
(See the view A)
• If the liquid side reducer is connected vertically without bending the liquid pipes, the insulation will not fit.
(Attached to the outdoor unit)
Liquid-side accessory pipe assy (1)
(Attached to the outdoor unit)
Gas-side accessory pipe assy (3)
Gas-side reducer (1)
Gas-side reducer (3)
Liquid-side
reducer (1)
Gas-side joint
Liquid-side joint
Liquid pipe
(field supply)
Liquid pipe
(field supply)
Gas pipe (field supply)
(select the pipe length on site)
straight size joint
(field supply)
straight size joint
(field supply)
Outdoor
unit A
Outdoor
unit B
Elbow
(field supply)
Gas pipe 2
(field supply)
(As per Table 4)
Gas pipe 2
(field supply)
(As per Table 5)
Liquid-side reducer
Gas-side joint
Liquid-side joint
Ground
Max.
+ 15°
Max.
+ 15°
View
(10°)
The work after the kit is connected
Connection of piping between the outdoor unit and the indoor unit
Air tight test
Insulation of joints
(1) Fit the insulation to the reducer and temporarily keep it in place with tape.
(2) Cut insulating tube along the slit. (See the figure at the right.)
Fit the insulation to the joint and temporarily keep it in place with tape without leaving a
gap between the insulation mating faces.
(3) Seal the seam between the insulation and the field supply piping insulation with the
field supply tape.
(4) Wrap the tape around the insulation attached to the joint without leaving a gap.
(
section shown in the figure at the right.)
Follow the instructions in the installation manual included with the outdoor unit,
when performing installation work.
Insulating tube
Tape (field supply)
Reducer
Insulating tube
Cut along the slit
Joint
Tape (field supply)
Tape (field supply)
Tape (field supply)
Local pipe’s insulating material
(1)
(2)
(3)
(4)
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...