Appendix
SiEN34-705
130
General Information
7.2 Piping Installation Point
(V3036)
Connection
Kit A
Connection
Kit B
Maximum length from a connection
kit. 10m or less from first branch.
(Equivalent Piping Length 13m)
5m or less
than 5m
Since there is a possibility that oil may be collected on a stop machine side, install piping
between outdoor units to go to level or go up to an outdoor unit, and to make a slope.
(V3037)
The projection part between multi connection piping kits
When the piping length between the multi connection kits or between multi connection kit and
outdoor unit is 2m or more, prepare a vertical projection part (200mm or more as shown below) only
on the gas pipe line location less than 2m from multi connection kit.
In the case of 2m or less
Less than 2m
(V3038)
Less than 2m
Less than 2m
Less than 2m
Vertical
Projection
Vertical
Projection
Vertical
Projection
In the case of 2m or more
2m or more
200mm or
more
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...