Installation
SiEN34-705
78
General Information
3.2.14 Installation of Outdoor Unit
!
Operational steps
Foundation of Units
Notes:
1. The proportions of cement : sand : gravel for the concrete shall be 1 : 2 : 4, and ten
reinforcement bars that their diameter are 10mm, (approx. 300mm intervals) shall be placed.
2. The surface shall be finished with mortar. The corner edges shall be chamfered.
3. When the foundation is built on a concrete floor, rubble is not necessary. However, the
surface of the section on which the foundation is built shall have rough finish.
4. A drain ditch shall be made around the foundation to thoroughly drain water from the
equipment installation area.
5. When installing the equipment on a roof, the floor strength shall be checked, and water-
proofing measures shall be taken.
6. Y groove unnecessary for 5HP Models.
7. When selecting the piping from the bottom, provide the height 200mm or more from a base.
(V1150)
Install outdoor unit
Prepare foundation
C:3D040102P
Y groove
Except 5Hp Modeles
When building a
foundation on the
ground
When building a
foundation on the
concrete floor
groove
groove
X - X
cross section
Drain ditch
(Smooth down grade of about 1/50)
Drain ditch
Nut
Spring washer
Frame
Foundation bolt type: JA
Size
M12
Four bolts are required
3 thread ridges
Foundation bolt executing method
When installing multiple units in connection
Floor
Model
5HP
8.10HP
12
•
14
•1
6
•1
8HP
RX(Y)Q5PY1, YL
Q8
•
10PY1, YL
RX(Y)Q12
•
14
•1
6
•1
8PY1, YL
497
792
1 102
697
992
1302
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...