1.8 Air Tight Test and Vacuum Drying
Note:
!
Always use nitrogen gas for the airtightness test.
!
Absolutely do not open the shutoff valve until the main power circuit insulation measurement
has been completed. (measuring after the shutoff valve is opened will cause the insulation
value to drop.)
1.8.1 Preparations
<Needed tools>
<The system for air tight test and vacuum drying>
!
Referring to figure 28, connect an nitrogen tank, refrigerant tank, and a vacuum pump to the
outdoor unit.
The refrigerant tank and the charge hose connection to refrigerant charge port or the valve
A, C in figure 28 are needed in “1-11. Additional Refrigerant Charge and Check Operation”.
!
The shutoff valve and valve A~C in figure 28 should be open or closed as shown in the table
below.
Note:
!
The airtightness test and vacuum drying should be done using the liquid
side and gas side shutoff valve service ports.
See the [R-410A] Label attached to the front plate of the outdoor unit for
details on the location of the service port (see figure at right).
!
See
[Shutoff valve operation procedure]
in “1-11-1 Before working” for
details on handling the shutoff valve.
!
The refrigerant charge port is connected to unit pipe.
When shipped, the unit contains the refrigerant, so use caution when
attaching the charge hose.
Gauge manifold
Charge hose valve
!
To prevent entry of any impurities and insure sufficient pressure resistance,
always use the special tools dedicated for R-410A.
!
Use charge hose that have pushing stick for connecting to service port of
shutoff valves or refrigerant charge port.
Vacuum pump
!
The vacuum pump for vacuum drying should be able to lower the pressure
to –100.7kPa (5 Torr –755mm Hg).
!
Take care the pump oil never flow backward into the refrigerant pipe during
the pump stops.
State of valve A, B and C and
shutoff valves
Valve
shutoff valve
A
B
C
Liquid side
Gas side
Air tight test, Vacuum drying
(Close valve A and shutoff valves
certainly. Otherwise the refrigerant
in the unit are released.)
Close
Open
Open
Close
Close
:
:
Gauge manifold
R-410A tank
(with siphon)
Charge
hose
Refrigerant charge port
Valve B
Outdoor
unit
Outdoor
unit
To indoor unit
Interunit pipings
Refrigerant flow
Liquid side
shutoff valve
Shutoff valve
service port
Gas side
shutoff valve
Vacuum
pump
Measuring
device
::
Valve C
Valve A
figure 28
Nitrogen
[R-410A] Label
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...