Points to Bear in Mind at the System Design
SiEN34-705
18
General Information
Step 2:
Preparation of the
Control Circuit
Diagrams
The following sequence should be followed in order to prepare control circuit diagrams in
accordance with the system list which has already been completed:
1
Diagrams should be prepared for each individual outdoor unit. The outdoor unit model
number should be inserted into the diagram. (RX(Y)Q16P)
2
Insert name of refrigerant system. (PAC1, PAC2)
3
Insert name of indoor unit. (FXCQ32M
→
CQ32M)
4
Insert system name of indoor unit.
5
Insert installation position. (Do this when demarcation is possible)
6
Insert remote control control wiring. (Group) Indicated by solid line. ........Solid line.
7
Insert centralized control wiring. ........Dotted line
8
Insert Group No. (G No. for each indoor unit with U No. 0)
The control circuit diagrams are now complete.
Example: Control circuit diagram
Example: Control circuit diagram
Centralized group No
쩻
System name
쩺
Model name
2nd floor office
2nd floor
reception room
3rd floor
design room
4th floor office
To central control panel
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...