SiEN34-705
Points to Bear in Mind at the System Design
General Information
17
2.4.2 Main Considerations in Preparation of Control Circuit Diagrams
In addition to the design of the appropriate this system configuration it is also essential that the
control system be made amply clear. If the system is designed and installed without a clear,
comprehensive plan then problems are inevitably going to occur during the test run.
Servicing too will become much more time consuming than necessary. However, if control
circuit diagrams are prepared along with the contract drawings in order to make the total system
clearly visible then the essential points relating to the electrical connections will be easily
understood, the test run will go off without a hitch and the whole system will be rendered fully
effective.
Step 1: Compiling
a System List
1. Mark each outdoor unit with a code.
2. Add field settings and data for outdoor units, and outdoor unit No. if using sequential start.
3. Add the model number of each indoor unit connected to each refrigerant circuit.
4. Assign each indoor unit a code.
5. Fill in the location of each indoor unit.
6. Group indoor units controlled by one or two remote controls. (group or individual control).
7. Assign central group Nos. if using centralized control.
8. Add field settings and optional equipment for indoor units.
9. Add unit No. if making separate field settings for each indoor unit under group control.
Note:
With the VRV III R-410A Heat Pump, Cooling Only Series, unit No. is determined through
automatic addressing, therefore readout unit Nos. after activating the power.
For details on field settings and centralized control group No., refer to the installation manual
and system reference materials.
Example: System list
Outdoor Unit
Indoor Unit
Model Name
(code)
Field Settings
Model Name System Name
Location
Remote
Control Group
Centralized
Control Group
No.
Unit No.
Optional
equipment, field
settings, etc.
RX(Y)Q16P
(PAC1)
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
Individual control
Sequential start:
ON Defrost:
Earlier
Sequential start
No.
FXCQ32M
2F01
2nd floor
office
A
1–00
FXSQ63M
2F02
2nd floor
office
A
(1–00)
FXCQ40M
2F03
2nd floor
office
A
(1–00)
FXHQ63MA
2F04
2nd floor
office
B
1–01
FXCQ50M
2F05
2nd floor
office
B
(1–01)
RX(Y)Q18P
(PAC2)
Cool/Heat
selector:
Indoor unit
Low noise
operation
(L.N.O.P):
Individual control
Sequential start:
ON Defrost:
Earlier
FXSQ32M
3F01
3rd floor
office
C
1–02
FXCQ40M
3F02
3rd floor
office
C
(1–02)
FXSQ40M
3F03
3nd floor
office
C
(1–02)
FXCQ50M
3F04
3rd floor
office
D
1–03
Содержание RXYQ5PY1
Страница 2: ......
Страница 287: ...SiEN34 705 Heat Pump 60Hz RXYQ5 54P Installation Manual 281...
Страница 292: ...Heat Pump 60Hz RXYQ5 54P SiEN34 705 286 Installation Manual...
Страница 339: ...Operation Manual SiEN34 705 332 Operation Manual...