Switchgear/Breaker – Manager
Ex ON/OFF
If the switchgear should be opened or closed by an external signal, the User can assign one signal that will trigger
the ON and one signal that will trigger the OFF command (e.g. digital inputs or output signals of the Logics). An
OFF command has priority. ON commands are slope oriented, OFF commands are level oriented.
Synchronised Switching*
*=availability depends on ordered device type
Before a switchgear may connect two mains sections, synchronism of these sections must be assured.
In the menu [Synchronous Switching] the parameter »Synchronism« defines which signal indicates synchronism.
If the synchronism condition shall be evaluated by the internal Synch-Check module the signal
»Sync. Ready to
Close« (release by synch-check module) has to be assigned. Alternatively a digital input or a logic output can be
assigned.
In the synchronisation mode “Generator-to-System” additionally the synchronism request has to be assigned in the
menu [Protection Para\Global Prot Para\Sync].
If a synchronism signal is assigned, the switching command will only be executed, when the synchronism signal will
become true within the maximum supervision time »
t-MaxSyncSuperv«. This supervision time will be started with
the issued ON command. If no synchronism signal has been assigned, the synchronism release is permanently.
509
MCDLV4
DOK-HB-MCDLV4-2E
Summary of Contents for HighPROtec MCDLV4
Page 3: ...Order Code Order Code 3 MCDLV4 DOK HB MCDLV4 2E...
Page 47: ...Installation and Connection 47 MCDLV4 DOK HB MCDLV4 2E...
Page 164: ...Input Output and LED Settings 164 MCDLV4 DOK HB MCDLV4 2E...
Page 433: ...Parameters 433 MCDLV4 DOK HB MCDLV4 2E...
Page 457: ...Device Parameters 457 MCDLV4 DOK HB MCDLV4 2E...
Page 473: ...Blockings 473 MCDLV4 DOK HB MCDLV4 2E...
Page 988: ...Protective Elements 988 MCDLV4 DOK HB MCDLV4 2E P P Q P Q P Q Q Q P S S...
Page 989: ...Protective Elements 989 MCDLV4 DOK HB MCDLV4 2E Pr Q P Q P Qr...
Page 1023: ...Protective Elements 1023 MCDLV4 DOK HB MCDLV4 2E...