⎯
166
⎯
6 F 2 S 0 8 4 6
Settings
The elements necessary for initiating a disturbance recording and their setting ranges are shown in
the table below.
Element Range
Step Default Remarks
Timer
0.1-3.0 s
0.1 s
1.0 s
Post-fault recording time
OCP-S
0.5-250.0 A
0.1 A
10.0 A
Overcurrent detection (phase fault)
(0.1-50.0 A
0.1 A
2.0 A) (*)
OCP-G
0.5-250.0 A
0.1 A
5.0 A
Overcurrent detection (earth fault)
(0.1-50.0 A
0.1 A
1.0 A)
UVP-S
0-132 V
1 V
88 V
Undervoltage detection (phase fault)
UVP-G
0-76 V
1 V
51 V
Undervoltage detection (earth fault)
(*) Current values shown in the parentheses are for the case of a 1A rating. Other current values are
for the case of a 5A rating.
Starting the disturbance recording by a tripping command or the starter elements listed above is
enabled or disabled by setting the following scheme switches with identical names with the starter
elements except the switch [TRIP].
Element Range Step Default Remarks
TRIP
OFF/ON
ON
Start by tripping command
OCP-S
OFF/ON
ON
Start by OCP-S operation
OCP-G
OFF/ON
ON
Start by OCP-G operation
UVP-S
OFF/ON
ON
Start by UVP-S operation
UVP-G
OFF/ON
ON
Start by UVP-G operation
Summary of Contents for GRZ100 B Series
Page 264: ... 263 6 F 2 S 0 8 4 6 Appendix A Block Diagram ...
Page 271: ... 270 6 F 2 S 0 8 4 6 ...
Page 272: ... 271 6 F 2 S 0 8 4 6 Appendix B Signal List ...
Page 307: ... 306 6 F 2 S 0 8 4 6 ...
Page 308: ... 307 6 F 2 S 0 8 4 6 Appendix C Variable Timer List ...
Page 310: ... 309 6 F 2 S 0 8 4 6 Appendix D Binary Input Output Default Setting List ...
Page 321: ... 320 6 F 2 S 0 8 4 6 ...
Page 322: ... 321 6 F 2 S 0 8 4 6 Appendix E Details of Relay Menu and LCD Button Operation ...
Page 331: ... 330 6 F 2 S 0 8 4 6 ...
Page 340: ... 339 6 F 2 S 0 8 4 6 Appendix G Typical External Connections ...
Page 377: ... 376 6 F 2 S 0 8 4 6 ...
Page 384: ... 383 6 F 2 S 0 8 4 6 Appendix J Return Repair Form ...
Page 388: ... 387 6 F 2 S 0 8 4 6 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 389: ... 388 6 F 2 S 0 8 4 6 ...
Page 390: ... 389 6 F 2 S 0 8 4 6 Appendix K Technical Data ...
Page 401: ... 400 6 F 2 S 0 8 4 6 ...
Page 402: ... 401 6 F 2 S 0 8 4 6 Appendix L Symbols Used in Scheme Logic ...
Page 405: ... 404 6 F 2 S 0 8 4 6 ...
Page 406: ... 405 6 F 2 S 0 8 4 6 Appendix M Example of Setting Calculation ...
Page 417: ... 416 6 F 2 S 0 8 4 6 ...
Page 418: ... 417 6 F 2 S 0 8 4 6 Appendix N IEC60870 5 103 Interoperability and Troubleshooting ...
Page 434: ... 433 6 F 2 S 0 8 4 6 Appendix P Inverse Time Characteristics ...
Page 437: ... 436 6 F 2 S 0 8 4 6 ...
Page 438: ... 437 6 F 2 S 0 8 4 6 Appendix Q Failed Module Tracing and Replacement ...
Page 444: ... 443 6 F 2 S 0 8 4 6 Appendix R Ordering ...
Page 447: ......