6.3 Preparations
Test equipment
The following test equipment is required for the commissioning tests.
1 Three-phase voltage source
1 Single-phase current source
1 Dynamic three-phase test set (for protection scheme test)
1 DC power supply
3 AC voltmeters
3 Phase angle meter
1 AC ammeter
1 DC voltmeter
1 Time counter, precision timer
1 PC (not essential)
Relay settings
Before starting the tests, it must be specified whether the tests will use the user’s settings or the
default settings.
For the default settings, see the following appendixes:
Appendix D
Binary Output Default Setting List
Appendix H
Relay Setting Sheet
Visual inspection
After unpacking the product, check for any damage to the relay case. If there is any damage, the
internal module might also have been affected. Contact the vendor.
Relay ratings
Check that the items described on the nameplate on the front of the relay conform to the user’s
specification. The items are: relay type and model, AC voltage, current and frequency ratings, and
auxiliary DC supply voltage rating.
Local PC
When using a local PC, connect it with the relay via the RS232C port on the front of the relay.
RSM100 software is required to run the PC.
For the details, see the separate volume "PC INTERFACE RSM100".
Summary of Contents for GRZ100 B Series
Page 264: ... 263 6 F 2 S 0 8 4 6 Appendix A Block Diagram ...
Page 271: ... 270 6 F 2 S 0 8 4 6 ...
Page 272: ... 271 6 F 2 S 0 8 4 6 Appendix B Signal List ...
Page 307: ... 306 6 F 2 S 0 8 4 6 ...
Page 308: ... 307 6 F 2 S 0 8 4 6 Appendix C Variable Timer List ...
Page 310: ... 309 6 F 2 S 0 8 4 6 Appendix D Binary Input Output Default Setting List ...
Page 321: ... 320 6 F 2 S 0 8 4 6 ...
Page 322: ... 321 6 F 2 S 0 8 4 6 Appendix E Details of Relay Menu and LCD Button Operation ...
Page 331: ... 330 6 F 2 S 0 8 4 6 ...
Page 340: ... 339 6 F 2 S 0 8 4 6 Appendix G Typical External Connections ...
Page 377: ... 376 6 F 2 S 0 8 4 6 ...
Page 384: ... 383 6 F 2 S 0 8 4 6 Appendix J Return Repair Form ...
Page 388: ... 387 6 F 2 S 0 8 4 6 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 389: ... 388 6 F 2 S 0 8 4 6 ...
Page 390: ... 389 6 F 2 S 0 8 4 6 Appendix K Technical Data ...
Page 401: ... 400 6 F 2 S 0 8 4 6 ...
Page 402: ... 401 6 F 2 S 0 8 4 6 Appendix L Symbols Used in Scheme Logic ...
Page 405: ... 404 6 F 2 S 0 8 4 6 ...
Page 406: ... 405 6 F 2 S 0 8 4 6 Appendix M Example of Setting Calculation ...
Page 417: ... 416 6 F 2 S 0 8 4 6 ...
Page 418: ... 417 6 F 2 S 0 8 4 6 Appendix N IEC60870 5 103 Interoperability and Troubleshooting ...
Page 434: ... 433 6 F 2 S 0 8 4 6 Appendix P Inverse Time Characteristics ...
Page 437: ... 436 6 F 2 S 0 8 4 6 ...
Page 438: ... 437 6 F 2 S 0 8 4 6 Appendix Q Failed Module Tracing and Replacement ...
Page 444: ... 443 6 F 2 S 0 8 4 6 Appendix R Ordering ...
Page 447: ......