VT failure detection is checked as follows:
•
Set the circuit breaker closed condition by applying a "1" signal to binary inputs BI1, BI2 and
BI3.
•
Press 5 (= Logic circuit) on the "Test" screen to display the "Logic circuit" screen.
•
Enter signal number 172 for the TermA line to observe the VT failure alarm signal, and 173
for the TermB line to observe the VT failure detection signal at monitoring jack A and B. Press
the ENTER key.
•
Apply a three-phase rated voltage. Then, remove single-, two- or three-phase voltage. Check
that the signals are instantly observed at jack B and observed at jack A after a 10s delay.
Blocking of the voltage-dependent protection is checked as follows:
•
Apply a three-phase rated voltage. Then, remove single-, two- or three-phase voltage and at
the same time apply a zone 1 fault. During this process, do not change the current.
Check that neither zone 1 tripping nor command tripping takes place.
•
In the similar manner, apply a zone 1 extension, zone 2 or zone 3 fault and check that tripping
does not take place.
Check that VT failure is recorded on the event record.
Power swing blocking
A power swing is detected when the condition that the PSBSOUT element operates and PSBSIN
element and residual overcurrent element EFL do not operate, for a period of TPSB setting or
more.
Power swing detection is checked as follows:
•
Press 5 (= Logic circuit) on the "Test" screen to display the "Logic circuit" screen.
•
Enter signal number 176 for the TermA line to observe the power swing blocking signal at
monitoring jack A and press the ENTER key.
•
Apply a phase fault which is set to midway between PSBSIN and PSBSOUT. Check that the
signal is generated with a delay of TPSB setting after the PSBSOUT operates. The PSBSOUT
operating time will be 1-2 cycles.
•
Reset the fault and check that the monitoring signal resets with a 500ms delay after PSBSOUT
resets.
•
Apply an earth fault which is set to midway between PSBSIN and PSBSOUT. Check that the
signal is not generated.
Power swing blocking is checked as follows:
•
Apply a zone 1 phase fault after generating the power swing blocking signal. The blocking
signal is generated in the way as mentioned above. Check that zone 1 tripping takes place if
scheme switch [PSB-Z1] is set to "Off" and does not take place if set to "On".
•
In the similar manner, apply zone 1x, zone 2, zone 3, zone F, zone R1 and zone R2 faults, and
check that tripping takes place or does not take place depending on the "On" or "Off" setting of
scheme switch [PSB-Z1X], [-Z2], [-Z3], [-ZF], [-ZR1] and [-ZR2].
Check that power swing blocking is recorded on the event record.
Summary of Contents for GRZ100 B Series
Page 264: ... 263 6 F 2 S 0 8 4 6 Appendix A Block Diagram ...
Page 271: ... 270 6 F 2 S 0 8 4 6 ...
Page 272: ... 271 6 F 2 S 0 8 4 6 Appendix B Signal List ...
Page 307: ... 306 6 F 2 S 0 8 4 6 ...
Page 308: ... 307 6 F 2 S 0 8 4 6 Appendix C Variable Timer List ...
Page 310: ... 309 6 F 2 S 0 8 4 6 Appendix D Binary Input Output Default Setting List ...
Page 321: ... 320 6 F 2 S 0 8 4 6 ...
Page 322: ... 321 6 F 2 S 0 8 4 6 Appendix E Details of Relay Menu and LCD Button Operation ...
Page 331: ... 330 6 F 2 S 0 8 4 6 ...
Page 340: ... 339 6 F 2 S 0 8 4 6 Appendix G Typical External Connections ...
Page 377: ... 376 6 F 2 S 0 8 4 6 ...
Page 384: ... 383 6 F 2 S 0 8 4 6 Appendix J Return Repair Form ...
Page 388: ... 387 6 F 2 S 0 8 4 6 Customer Name Company Name Address Telephone No Facsimile No Signature ...
Page 389: ... 388 6 F 2 S 0 8 4 6 ...
Page 390: ... 389 6 F 2 S 0 8 4 6 Appendix K Technical Data ...
Page 401: ... 400 6 F 2 S 0 8 4 6 ...
Page 402: ... 401 6 F 2 S 0 8 4 6 Appendix L Symbols Used in Scheme Logic ...
Page 405: ... 404 6 F 2 S 0 8 4 6 ...
Page 406: ... 405 6 F 2 S 0 8 4 6 Appendix M Example of Setting Calculation ...
Page 417: ... 416 6 F 2 S 0 8 4 6 ...
Page 418: ... 417 6 F 2 S 0 8 4 6 Appendix N IEC60870 5 103 Interoperability and Troubleshooting ...
Page 434: ... 433 6 F 2 S 0 8 4 6 Appendix P Inverse Time Characteristics ...
Page 437: ... 436 6 F 2 S 0 8 4 6 ...
Page 438: ... 437 6 F 2 S 0 8 4 6 Appendix Q Failed Module Tracing and Replacement ...
Page 444: ... 443 6 F 2 S 0 8 4 6 Appendix R Ordering ...
Page 447: ......