![background image](http://html1.mh-extra.com/html/omron/cx-process-monitor-plus-2/cx-process-monitor-plus-2_operation-manual_744195115.webp)
100
Trend Screens
Section 4-9
(3) Detailed Settings
When the tag name is set above, the upper/lower limits of the specified
tag will be displayed by default. The setting can be changed.
(4) Delete
Deletes the selected pen.
Note
(a) When the Delete Button is pressed in step 4, above, all tag infor-
mation will be deleted from the Trend Screen, including the graph-
ic display for the pen.
(b) After the four items above are set and the
OK
Button is clicked,
some time will be required before the results are displayed on the
Trend Screen. This time will be the collection cycle (approximately
10 s for realtime trends and 60 s for historical trends) plus the
screen refresh cycle (a few seconds). If another screen is
switched to, the changes will be reflected in the screen as soon
as it is returned to.
(c) If the scaling settings have been changed using the CX-Process
Tool, change the tag upper and lower limit settings to match the
changed values using the
Detail
Button in the Update of Pen In-
formation Dialog Box.
Adding Pens from the Dialog Box
Use the following procedure to assign a tag to a pen for which one is not yet
assigned.
1,2,3...
1.
Double-click in the area circled in the screen shown below.
Summary of Contents for CX-Process Monitor Plus 2
Page 1: ...CX Process Monitor Plus Ver 2 Cat No W428 E1 02 SYSMAC WS02 LCMC1 EV2 OPERATION MANUAL...
Page 2: ...WS02 LCMC1 EV2 CX Process Monitor Plus Ver 2 Operation Manual Revised January 2007...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ...x...
Page 15: ...xvi Application Precautions 4...
Page 41: ...26 Basic Operating Procedure Section 1 2...
Page 243: ...228 Checking Configurations Section 5 7...
Page 267: ...252 Reading Writing Function Block ITEMs Appendix A...
Page 269: ...254 Differences between Trend Screens and Batch Trend Screens Appendix B...