![background image](http://html1.mh-extra.com/html/omron/cx-process-monitor-plus-2/cx-process-monitor-plus-2_operation-manual_744195233.webp)
218
System Information Settings
Section 5-6
Trend Settings: Realtime
Trend and Historical Trend
Collection Cycles
The trend data collection cycles on the Trend Screen are set separately for
realtime trends (1 to 30 s) and historical trends (1 to 60 min).
When a collection cycle setting is changed, one of the following dialog boxes
will be displayed.
Click the OK Button to make the change, or click the Cancel Button to cancel
the change.
Batch Trend File Retention
Period
Select the option to have batch trend files created on the Batch Trend Screen
deleted after a fixed period has elapsed.
Then set the number of days (from 10 to 36,600) for the batch trend file reten-
tion period.
By default this function is enabled and the retention period is set at 366 days.
Segment Program 2 File
Retention Period
Select the option to have segment trend files created on the Segment Pro-
gram 2 Screen deleted after a fixed period has elapsed.
Then set the number of days (from 10 to 36,600) for the segment trend file
retention period.
By default this function is enabled and the retention period is set at 366 days.
Summary of Contents for CX-Process Monitor Plus 2
Page 1: ...CX Process Monitor Plus Ver 2 Cat No W428 E1 02 SYSMAC WS02 LCMC1 EV2 OPERATION MANUAL...
Page 2: ...WS02 LCMC1 EV2 CX Process Monitor Plus Ver 2 Operation Manual Revised January 2007...
Page 3: ...iv...
Page 5: ...vi...
Page 9: ...x...
Page 15: ...xvi Application Precautions 4...
Page 41: ...26 Basic Operating Procedure Section 1 2...
Page 243: ...228 Checking Configurations Section 5 7...
Page 267: ...252 Reading Writing Function Block ITEMs Appendix A...
Page 269: ...254 Differences between Trend Screens and Batch Trend Screens Appendix B...